City Council Meeting: February 12, 2008

Agenda Item: 6-A

To:                   Mayor and City Council

From:              Eileen P. Fogarty, Director of Planning and Community Development

Subject:          Appeal of Landmarks Commission approval of Certificate of Appropriateness Application for demolition of a non-contributing structure and construction of a new single-family residence at 2642 Second Street.

 

Recommended Action

Staff recommends the City Council deny appeal 07APP-010 and approve Certificate of Appropriateness application 07CA-009 for demolition of a non-contributing structure and construction of new a single-family residence located at 2642 Second Street, based on the findings set forth by the Landmarks Commission in its action on December 10, 2007.


Executive Summary

This report supports the Landmarks Commission’s approval of a Certificate of Appropriateness application filed by property owners Mark R. Gorman and Beth Burns for construction of a new 2,365 square foot single-family residence on a non-contributing parcel located in the Third Street Neighborhood Historic District (“the District”).  On December 10, 2007, a majority of the Landmarks Commission determined that the design of the new, single-family residence and its placement on the parcel would be harmonious with the overall character of the District and with the scale, materials, and massing of Contributing Structures within the District, and therefore approved the application by a vote of 4-1.

 

This report presents analysis of the proposed project in light of the required finding for approval set forth in SMMC Section 9.40.030 (c) (4) that requires new construction be harmonious and compatible with the character of the District and with the scale, massing and materials of contributing structures in the District. The report also addresses the points of the appeal filed by Beatrice Nemlaha, Scott Campbell, and Tony Haig that, in summary, assert the Landmarks Commission erred it in approval of the Certificate of Appropriateness application because the proposed project is not compatible with the character of the District or with Contributing Structures in the District, and is not consistent with the adopted District design guidelines for new construction. In consideration of the full record to date, including review of the appellants’ appeal statement, it is recommended that the Landmarks Commission’s approval of the Certificate of Appropriateness be upheld and the appeal, therefore, be denied. 

 

Discussion

On August 28, 2007, Mark R. Gorman and Beth Burns filed a Certificate of Appropriateness application requesting demolition of an existing non-contributing structure and construction of a new two-story 2,365 square foot single-family residence at 2642 Second Street, located within the Third Street Neighborhood Historic District (“District”).  The subject property is approximately 50’ x 100’ and is located on the west side of Second Street between Beach and Hill Streets.  The existing one-story duplex on site was constructed in 1953 and was determined to be a non-contributing structure when the District was established in July 1990. 

 

The west side of Second Street contains a total of three contributing structures: two adjacent structures at the corner of Ocean Park Boulevard and one structure located two parcels south of the subject property. The properties to the north of the subject property consist of a parking lot and one-story structure.  The property to the south is currently vacant, however an approval was recently granted for the construction of a new, two-story plus mezzanine single-family residence.  

 

Text Box: Rendering of Proposed Single-Family Residence 2642 Second Street


Text Box:  Third Street Neighborhood Historic District Boundaries 
                                                                                                                 

 

Third Street Neighborhood Historic District Standards & Design Guidelines

When the District was established, its intent was documented in an application referenced in the Municipal Code (SMMC 9.36.290) describing in detail the neighborhood’s history, architectural character, proposed boundary alternatives, and the purpose for establishing this area as a historic district.  Out of three alternatives offered in the application, the Council designated the District boundaries to include the west side of Second Street, in part, because there was interest on the part of district applicants in relocating historic structures from other areas to these non-contributing and empty parcels on Second Street.  When the District was established, contributing structures were defined as those structures that were built during or prior to 1935; non-contributing properties were identified as vacant parcels and those structures constructed after 1935. 

 

Following the establishment of the Third Street Neighborhood Historic District, the Landmarks Commission adopted the Third Street Neighborhood Design Guidelines and a Landscape Survey (“District Guidelines”) in 1992.  These District Guidelines are discussed more fully beginning on page 9 of this report.

 

Landmarks Commission Action

The Landmarks Commission held a public hearing for the Certificate of Appropriateness application on October 8, 2007.  After listening to public testimony both in opposition and in support of the project, and after an extensive discussion regarding the proposal, the hearing was continued to allow the applicant to revise the project based on specific direction provided by the Commission during the course of the discussion.  The Landmarks Commission reviewed the revised project at its December 10, 2007 meeting and determined that the applicant had made appropriate revisions that served to enhance its compatibility with the District.  The Commission approved the Certificate of Appropriateness application by a vote of 4-1.  The majority of the Commission based its approval, in part, on the following factors:

 

  • The project’s overall design concept is appropriately responsive to the character of the District and its context on Second Street. The design incorporates carefully selected architectural elements and a palette of materials that complement and reflect in a contemporary and respectful manner the District’s character while also creating an understated backdrop for the historic architecture in the District.

 

  • The project’s restrained modern design, overall building form, low overall building height, and articulated building volumes are harmonious and compatible with the character of the District and with characteristics found in the architecture of a variety of contributing structures in the Historic District.

 

As a condition of approval, the Commission required the applicant to work with the Landmarks Commission Secretary to select a modified exterior paint color palette.

 

The full text of the Landmarks Commission’s Statement of Official Action is presented as Attachment B. October 8, 2007 and December 10, 2007 staff reports and meeting minutes are presented as Attachments C and D, respectively.

 

Appeal Summary

The appellants state that the Landmarks Commission erred in its decision to approve the Certificate of Appropriateness application. The following is a summary of the appellants’ statement; the full text of the appeal is contained in Attachment A:

 

·              The proposed project damages the character of the District and violates the purpose for creating the District and the story of an early Santa Monica beach neighborhood the District was created to tell.

 

·              The project does not comply with the criteria for issuance of a Certificate of Appropriateness contained in SMMC Section 9.36.140.

 

·              The project is incompatible with the District’s dominant architectural character found in its California bungalows.

 

·              The Landmarks Commission failed to strictly apply the Third Street Neighborhood Historic District Design Guidelines in evaluating and approving the project and instead substituted its own criteria that new buildings should be “of their time”, a standard not included in the any standards or guidelines relevant to the District.

 

·              The project’s massing, style, building shape, and materials do not complement the surrounding contributing structures in the District as required in the District Design Guidelines.

 

·              The Landmarks Commission failed to apply the analysis of District character-defining features presented in a report prepared by a preservation consultant hired by some neighborhood residents.

 

The City Council, in its review of this appeal, must determine whether the proposed project for construction of a new single-family residence on a non-contributing parcel meets the following criteria for issuance of a Certificate of Appropriateness in the Third Street Neighborhood Historic District set forth in SMMC Section 9.40.030 (c) (4): 

 

That in the case of any proposed construction of a new improvement on any parcel located within the District boundaries, the exterior features of such new improvement and its placement on the property would not adversely affect and not be disharmonious with the District character as set forth in Section 9.36.290, and with the scale, materials and massing of the contributing structures within the District.

 

Appeal Analysis

Based on the full record to date, including testimony and documentary evidence presented at Landmarks Commission public hearings, there is ample support for the Commission’s decision to approve the Certificate of Appropriateness.  Therefore, staff continues to recommend approval of the Certificate of Appropriateness as detailed more fully in the staff reports provided for the Landmark Commission hearings. The following discussion briefly describes the proposed project, addresses the appellants’ key arguments, and also summarizes the basis for staff’s determination. 

 

Description of Project Design

The applicant proposes to demolish the existing structures on site and construct a 2,365 square foot, two-story residence with a roof deck. A detached two-car garage is proposed at the rear of the parcel at the northwest corner. 

All setbacks incorporated into the project design meet zoning ordinance requirements for the OP-2 Zoning District.  The height of the proposed residence is 20’-0” to the top of the flat roof and 23’-0” to the top of the clerestory skylights that are stepped back from the primary, street-facing elevation.  The maximum height permitted in the Zoning District is 30’-0”. 

 

The proposed two-story residence is composed of two rectangular volumes clad in sand finish stucco and wood. Its design reflects elements of the International style in accordance with the adopted Ocean Park Neighborhood Development Guide which specifies that new construction in the OP Zoning Districts must be designed in the following historical styles: International style/modern, Craftsman bungalow, or Spanish Colonial Revival/Mediterranean style. 

 

 

 

 

 

 

Text Box: Primary Elevation of Proposed Single-Family Residence at 2642 Second Street:

 

The primary, street-facing elevation features doors and windows framed in teak wood, a centrally-located second floor balcony and a ground floor recessed primary entry.  Fenestration on the primary elevation consists of ground-floor windows divided into multiple panes a maximum of 2’-0” wide and divided wrap-around windows on the second-story accented by a reclaimed ponderosa pine eyebrow on the south volume. 

 

A ponderosa pine screen has been incorporated on the primary, street facing elevation adjacent to the main entry in order to add texture and finer-grain detail to the sections of smooth stucco on this elevation. This ponderosa screen also serves divide the expanse of glass on the ground floor of the street-facing elevation.

 

The north volume features reclaimed ponderosa pine vertical siding and an overlay of wood boards turned to a 90-degree angle forming a ‘bris-soleil’ type trellis for plantings. This wood cladding wraps around from the primary, east-facing elevation to the north elevation adjacent to the proposed driveway leading to the garage sited at the rear of the parcel. 

 

The applicant proposes an exterior stair on the inside, northwest corner of the house. This stair has been set back as far from the street as possible and has been designed so that the stair guardrail is located below the roofline to entirely eliminate its visibility from the street. 

 

The south elevation features sand finish stucco, aluminum framed fenestration and a horizontal ponderosa pine eyebrow extending the above the second floor windows to the rear of the building.

 

A grass-crete driveway is proposed on the north side of the parcel that would lead to a two-car garage at the rear of the property.  This one-story structure is also proposed with a ponderosa pine trellis element with plantings and a wooden garage door.

 

 

 

 

Text Box: North Elevation of Proposed Single-Family Residence at 2642 Second Street
(Massing of Recently-Approved New Construction on Adjacent Parcel to the South Shown in Background)

 

 

 

Text Box: South Elevation of Proposed Single-Family Residence at 2642 Second Street

 

Historic District Design Guidelines and Certificate of Appropriateness Criteria

The appellants state the proposed project does not comply with the criteria for issuance of a Certificate of Appropriateness contained in SMMC Section 9.36.140.  All proposed work in the Third Street Neighborhood Historic District is subject to the procedures and criteria established in SMMC Chapter 9.40. It is important to note that SMMC Chapter 9.40 provides criteria specifically-tailored to the context of the Historic District in order to evaluate different types of projects that require a Certificate of Appropriateness in the Third Street District.  For such projects, these criteria must be used in lieu of the findings applicable to properties located outside of the Third Street Historic District established in SMMC Chapter 9.36 cited by the appellants. 

 

The criteria relevant to the proposed project specifies that, “in the case of any proposed construction of a new improvement on any parcel located within the District boundaries, the exterior features of such new improvement and its placement on the property would not adversely affect and not be disharmonious with the District character as set forth in Section 9.36.290, and with the scale, materials and massing of the contributing structures within the District.”

 

While this criterion for issuance of a Certificate of Appropriateness in the Third Street Neighborhood Historic District does not require consistency with the District Design Guidelines, the Guidelines are still relevant.  The Guidelines should be used to assist in the assessment of whether the applicable finding can be made.  In this instance, the Design Guidelines were used to help assess whether the project is compatible with the character of the District and with the scale, massing, and materials of Contributing Structures in the District in accordance with the applicable Certificate of Appropriateness criterion for new construction described above.

 

The appellants’ state that the Commission failed to strictly apply the Third Street Neighborhood Historic District Design Guidelines, and that the project’s massing, style, building shape, and materials do not complement the surrounding contributing structures in the District as required in the District Design Guidelines.

 

In contrast to the appellants’ assertion, the following presents a discussion of how staff and the Commission both found that the proposed project does, indeed, meet the required Certificate of Appropriateness criterion for new construction and also complies with District Design Guidelines.

 

Analysis of Project Design

The way in which the new building visually relates to adjacent properties is an important aspect of staff review of new construction in the Third Street Neighborhood Historic District. A new building constructed in a historic district should respect and not detrimentally impact the character of the District. Compatibility is achieved by identifying and incorporating elements found in the historic district into the design of the new structure. 

 

The goal is not to imitate or duplicate a historic building, thereby creating a false sense of history, but to construct a new building that is compatible with its surroundings.  In this instance, the project site is located on the west side of Second Street; this portion of the District presents a different visual experience in comparison to other sections of the District which possess a more significant concentration of contributing structures thereby creating a more cohesive sense of the District’s historic context.   A photo montage of the east and a west side of Second Street is presented in Attachment E.

 

For proposed new construction, the Third Street Neighborhood Historic District Guidelines state that “new buildings should be carefully designed to complement and not overwhelm the surrounding historic buildings” and suggest the following four criteria:

 

·        Use exterior materials traditionally found in the Third Street neighborhood, such as wood and stucco.

 

·        Maintain setbacks, heights, and overall building shapes that are similar to surrounding contributing buildings in the historic district.

 

·        Use windows and architectural details at the street level to create a pedestrian scale and a “neighbor-friendly” character.

 

·        Include a clearly defined main entrance that is oriented toward the street. Parking should be at the rear of the property.”

 

Compatibility with the Character of the District – Scale and Massing

While the appellants state that the project is incompatible with the District’s dominant architectural character found its California bungalows, the District does, in fact, possesses a variety of architectural styles that are described in both the section of the Municipal Code that addresses the character of the District (SMMC 9.36.290), as well as in the District Design Guidelines. Both of these describe the Third Street Neighborhood Historic District as possessing architectural significance to Santa Monica because the area displays a variety of architectural styles, from Victorian to Gothic, to American Colonial Revival, to California Craftsman, to Spanish Colonial Revival, which provide a visual representation of the Neighborhood’s development through the 1930s. This description goes on to state that, in addition, “the neighborhood is dominated by bungalows; twenty-nine bungalows and one bungalow court are extant in the District.” 

 

 The criterion for issuance of a Certificate of Appropriateness for new construction states that the project must be compatible with the scale, materials, and massing of contributing structures. No where in this language is a requirement that California bungalows are the only contributing structures with which compatibility must be achieved.  The Municipal Code and the Design Guidelines both make it clear that there are a variety of architectural styles that help to define the significance of the District.

 

Furthermore, many Contributing Structures in the District are two-story structures including 231 Hill Street, 245 Hill Street, 2627 3rd Street, 2637 Third Street, and 2614 Second  Street, and it is appropriate to allow two stories on this property, provided that the design of the proposed structure does not overwhelm nearby contributing properties.

 

Therefore, it is appropriate to state that the proposed project’s setbacks, simple rectangular volumes, flat roof, and low scale (20’-0”) are characteristics that are consistent with the architecture of contributing structures in the Historic District.

 

Specifically, the project’s overall building form, low overall building height and articulated building volumes are harmonious with the contributing structures that exhibit American Colonial Revival and Spanish Colonial Revival architecture (2545 2nd Street, 2546 3rd Street, 246 Beach Street, and 245 Hill Street, and 2637 3rd Street).

Text Box: Contributing Structures in the District: 245 Hill Street (left); 2545 Second Street (center); and 231 Hill Street (right).

Furthermore, the project design relates harmoniously to its placement within the historic district in that non-contributing parcels are adjacent to the subject property an site planning for the project incorporates sensitivity to the adjacent parcel to the south which is currently vacant but has been approved for a new 30’-0” tall two-story residence. The tallest portions of the proposed project comprised of the clerestory skylight stepped back from the street are sited adjacent to this parcel; the proposed project’s driveway is adjacent to the parcels to the north which consist of a surface parking lot and two, one-story structures. 

Compatibility with the Character of the District – Materials and Architectural Details

The proposed project design incorporates extensive use of wood and stucco materials such as sand finish stucco, teakwood framed fenestration, and use of reclaimed ponderosa pine wood screens on the primary, street-facing and north elevations. This is consistent with the materials traditionally found in many of contributing structures in the District that are comprised of California Bungalow, Spanish Colonial Revival, and American Colonial Revival architectural styles.

 

The proposed project incorporates carefully selected architectural elements that complement and reflect the District’s character while also creating an understated backdrop for the historic architecture in the District.  The project incorporates extensive wood architectural screen and trellis elements that create a neighbor-friendly character and also reflect in a contemporary but respectful and compatible manner the traditional wood cladding found in the District’s California bungalow and American Colonial Revival architecture. 

 

The project also design incorporates extensive multi-pane fenestration that echoes the proportions and type of details found in the District’s historic California bungalow and Victorian architecture. These windows provide a connection between the interior and exterior landscape as well as provide visual interest and create a pedestrian friendly environmental and scale as viewed from the street. 

 

District Design Guidelines for new construction state that projects should include a clearly defined main entrance that is oriented toward the street and that should be at the rear of the property. Accordingly, the project design incorporates a clearly defined main entrance that faces the street and is flanked by wood accents and a detached accessory garage is proposed at the rear of the property.

 

Based on the whole of the record, staff recommends that the City Council uphold the Landmarks Commission’s approval of Certificate of Appropriateness application 07CA-009 for approval to demolish the existing non-contributing structure on site and construct a new, single-family residence at 2642 Second Street, a non-contributing parcel located in the Third Street Neighborhood Historic District.

 

Alternatives

As an alternative to the staff recommendation, the Council may consider the following with respect to the pending appeal if supported by the full evidentiary records:

1.      Denying the Appeal.

2.      Remanding the application to the Landmarks Commission for reconsideration.

 

Environmental Analysis

The project is categorically exempt from the provisions of California Environmental Quality Act (CEQA) pursuant to Section 15303, Class 3 and Section 15331, Class 31 of the State Implementation Guidelines in that the project consists of the construction of a new single family residence and designed in a manner consistent with the Secretary of the Interior’s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995), Weeks and Grimmer. 

 

Public Outreach

As required by the Municipal Code, the Third Street Neighborhood Citizen’s Participation Committee (CPC) was notified of the application for and appeal of the Certificate of Appropriateness, including notice of all hearings.  Additionally, this hearing has been noticed with on-site posting and mailed notice of hearing as required in SMMC Sub-section 9.40.040(b).

 

Financial Impacts & Budget Actions

The recommendation presented in this report does not have any budget or fiscal impact.

 

 

 

 

Prepared by:

Roxanne Tanemori, AICP, Associate Planner

 

Approved:

 

Forwarded to Council:

 

 

 

 

 

 

Eileen P. Fogarty

Director, Planning and Community Development

 

P. Lamont Ewell

City Manager

 

 

 

Attachments

 

A.                 Appellants’ Appeal Statement

B.                 Landmarks Commission Statement of Official Action, December 10, 2007

C.                Landmarks Commission Minutes, October 8, 2007 and December 10, 2007

D.                Landmarks Commission Staff Reports and Hearing Submittals, October 8, 2007 and December 10, 2007

E.                 Property Owners’ Statement Regarding the Appeal and Project Plans and Renderings


 

ATTACHMENT A

 

Appellants’ Appeal Statement

 

Electronic version of attachment is not available for review.  Document is available for review at the City Clerk’s Office and the Libraries.

 

 


ATTACHMENT B

 

 

 

Landmarks Commission Statement of Official Action


LANDMARKS COMMISSION

OF THE CITY OF SANTA MONICA

 STATEMENT OF OFFICIAL ACTION

 

 

 

 

PROJECT

 

 

SUBJECT:                 LC-07CA-009

 

ADDRESS:               2642 2nd Street           

 

APPLICANT:             Mark R. Gorman and Beth Burns

 

REQUEST:                Application for a Certificate of Appropriateness for approval to demolish a Non-Contributing Structure on the property at 2642 Second Street and construct a new single-family residence on the parcel located within the Third Street Neighborhood Historic District.

 

 

LANDMARKS COMMISSION ACTION

 

12/10/2007                Date

 

     X                            Approved based on the following findings and subject to the conditions below.

 

            ___                 Denied

 

            ___                 Other

 

 

EFFECTIVE DATE OF ACTION

 

12/20/2007                Certificate of Appropriateness LC-07CA-009

 

 

EXPIRATION DATE OF PERMIT GRANTED

 

12/20/2008                Certificate of Appropriateness LC-07CA-009

 

 

CERTIFICATE OF APPROPRIATENESS FINDINGS (SMMC 9.40.030)

 

1.                  The proposed project is included within the list of work enumerated in SMMC Section 9.40.020 (d) (4).

 

2.      As conditioned herein, the exterior features of the proposed new improvement on a parcel located within the Third Street Neighborhood Historic District boundaries and its placement on the property would not adversely affect and would not be disharmonious with the District character as set forth in Section 9.36.290, and with the scale, materials and massing of the contributing structures within the District in that the scale, massing, volume and materials proposed in the two-story single-family residence are consistent with the District’s intention that new structures should respect the neighborhood’s historic scale and character. The proposed demolition of the Non-Contributing structures on the parcel would also not adversely affect the character of the District since the existing structures were constructed in 1953 and do not contribute to the District’s period of significance. The proposed new construction relates harmoniously to its placement within the historic district as described in the Third Street Neighborhood Historic District Design Guidelines and Landscape Survey which advises that infill buildings should “maintain setbacks, heights, and overall building shapes that are similar to surrounding contributing buildings in the Historic District.” Many Contributing Structures in the District are two-story structures including 231 Hill Street, 245 Hill Street, 2627 3rd Street, 2637 Hill Street, 2614 2nd Street, and it is appropriate to allow two stories on this property, provided that the design of the proposed structure does not overwhelm nearby contributing properties. The maximum height of the proposed residence is 23’-0” in height with the maximum height of the street-facing façade at 20’-0”.  Furthermore, the adjacent parcel to the south is currently vacant but has been approved for a new 30’-0” tall two-story residence; the tallest portions of the proposed project comprised of the clerestory skylight stepped back from the street are sited adjacent to this parcel. The parcels to the north consist of a surface parking lot and two one-story structures. 

 

While the District possesses a variety of architectural styles, the project’s simple rectangular volumes, flat roof, and low scale are characteristic in the architecture of other Contributing Structures in the Historic District.  Specifically, the project’s restrained modern design, overall building form, low overall building height and articulated building volumes are harmonious with the examples of American Colonial Revival and Spanish Colonial Revival architecture (2545 2nd Street, 2546 3rd Street, 246 Beach Street, and 245 Hill Street, and 2637 3rd Street).

 

The District’s character includes exterior materials of wood and stucco traditionally found in many of the Contributing Structures, and these materials are reflected in the project’s extensive use of wood and stucco materials such as sand finish stucco, teakwood framed fenestration, and use of reclaimed wood screens that reflect in a contemporary but respectful and compatible manner the traditional wood cladding found in the District’s architecture.  The use of compatible exterior materials of wood and stucco, characteristic of the District, is also consistent with the Third Street Neighborhood Historic District Design Guidelines and Landscape Survey.   

 

The District’s character is also defined by the use of “numerous windows to provide views and to merge the interior and exterior landscapes,” as stated in Section 9.36.290 which sets forth aspects of the District’s character.  The Third Street Neighborhood Historic District Design Guidelines and Landscape Survey also advises that new construction shall use “windows and architectural details at the street level to create a pedestrian scale and a ‘neighbor-friendly’ character.”  The project incorporates extensive multi-pane fenestration that echoes the proportions and type of details found in the District, provides a connection between the interior and exterior landscape as well as provides visual interest as viewed from the street. Further, the District Design Guidelines advises that new construction should “include a clearly defined main entrance that is oriented toward the street,” and that “parking should be at the rear of the property.”  The project complies with these guidelines as the main entrance faces the street and the project’s horizontal and vertical design elements define the main entrance.  A detached accessory garage to house parking is located at the rear of the property.

 

Finally, the project’s overall design concept has been carefully developed to be compatible with the scale, materials, and massing of the Contributing Structures within the District.  The project design also incorporates carefully selected architectural elements and materials that complement and reflect the District’s character while also creating an understated backdrop for the historic architecture in the District.

 

Based on the foregoing, the proposed project is consistent with the Secretary of the Interior’s Standards for the Treatment of Historic Properties, and with the guidelines set forth in the Third Street Neighborhood Historic District Design Guidelines and Landscape Survey.

 

CONDITIONS

 

1.                  This approval is for the plans dated November 1, 2007 and December 1, 2007 (north elevation only) which are on file in the City Planning Division.

 

2.                  Prior to issuance of a building permit, the applicant shall submit for review and approval to the Landmarks Commission Secretary a revised exterior building color palette. 

 

3.                  This Certificate of Appropriateness shall be in full force and effect from and after the date of the rendering of the decision by the Commission.  Pursuant to Landmarks Ordinance Section 9.36.170(h), this approval shall expire within one year if the authorized work is not commenced.  Should the applicant be unable to comply with this restriction, an extension may be granted pursuant to Section 9.36.250 for an additional 180 days maximum.  The applicant must request such an extension prior to expiration of this permit.  After that time, the applicant will be required to return to the Commission for approval.  In addition, this Certificate of Appropriateness shall expire if the authorized work is suspended for a 180-day period after being commenced.   

 

4.                  All required Planning and Building Permit approvals shall be obtained.

 

5.                  This decision may be appealed by properly filing with the Director of Planning a Notice of Appeal on a form furnished by the Planning Department.  Such notice shall be filed within a ten (10) day time period commencing from the date of the determination.

 

 

VOTE:

 

Ayes:              Bach, Berley, Kaplan, Fresco

Nays:              Shari

Abstain:          Genser (recused)

Absent:          Lehrer

 

NOTICE

 

If this is a final decision not subject to further appeal under the City of Santa Monica Comprehensive Land Use and Zoning Ordinance, the time within which judicial review of this decision must be sought is governed by Code of Civil Procedure Section 1094.6, which provision has been adopted by the City pursuant to Municipal Code Section 1400.

 

I hereby certify that this Statement of Official Action accurately reflects the final determination of the Landmarks Commission of the City of Santa Monica.

 

 

                                _                                               ____________________                 

Nina Fresco, Chairperson                        Date

 

 

 

 


ATTACHMENT C

 

Landmarks Commission Minutes, October 8, 2007 and December 10, 2007

 


 

 

 

MINUTES

 

REGULAR MEETING OF THE

LANDMARKS COMMISSION

 

Founded 1875

Populus felix in urbe felici

 

 

 

Monday, October 8, 2007

7:00 PM

City Council Chambers, Room 213

1685 Main Street, Santa Monica

 

 

CALL TO ORDER OF THE REGULAR MEETING OF THE LANDMARKS COMMISSION: The meeting was called to order at 7:02 pm.

 

1.                  ROLL CALL:                        Present:          Margaret Bach

John Berley

Roger Genser

Nina Fresco, Chairperson

Barbara Kaplan, Chair Pro Tempore

Ruthann Lehrer

Ruth Shari

 

                                        Also Present:         Kevin McKeown, City Council Liaison

Barry Rosenbaum, Senior Land Use Attorney

Roxanne Tanemori, Commission Secretary

Susan Umeda, Staff Assistant III

 

2.                  REPORT FROM STAFF:

 

Ms. Tanemori presented updates on upcoming City Council agenda items.  She also provided the Commission with additional information regarding the Citywide Update noting that 32 properties were submitted as a result of the summer’s outreach to the community regarding potentially significant buildings.

 

Chair Fresco asked staff if an “urban design plan” will be created in conjunction with the Land Use and Circulation Element Update.  Ms. Tanemori responded that part of the work plan for fiscal year 2007/2008 does include preparation of an urban design principles guide for new development, though the format has not yet been fully developed.  Staff will keep the Commission informed about progress on this document.

 

3.                  COMMISSIONER ANNOUNCEMENTS:

 

Commissioner Lehrer announced that the Santa Monica Conservancy will conduct a workshop on October 28, 2007 at John Zinner’s home; the workshop will address the topic of sustainability and historic homes. 

 

4.                  APPROVAL OF MINUTES:

 

4-A.     September 10, 2007

 

The Commission made several corrections to the September 10, 2007 minutes.  Commissioner Lehrer made a motion to approve the minutes with corrections.  Commissioner Genser seconded the motion.  The motion was approved by voice vote with Commissioner Berley abstaining.

 

5.                  APPROVAL OF STATEMENTS OF OFFICIAL ACTION:

 

5-A.     Landmark Designation Application, 06LM-009, 200–1500 block of Ocean Avenue, designating Palisades Park as a City Landmark and Landmark Parcel.

 

The following members of the public addressed the Commission: Jerry Rubin, who expressed his approval of the designation.

 

Commissioner Bach submitted suggested alternative language to the Findings and Determination to the Commission.  She stated that the designation was very important and the Findings and Determination should capture the true extent of the significance of the park.  Therefore, she presented the Commission with suggested alternative language to clarify the significance of the park.

 

Chair Fresco stated that the suggested alternative language did not appear to change the substance of the draft findings prepared by staff.  Chair Fresco asked Commissioner Bach if the suggested alternative language only eliminated redundancies and smoothed out of the language.  Commissioner Bach gave examples of the changes that she had suggested.

 

Commissioner Lehrer noted that both the Findings and Determination and the suggestions made by Commissioner Bach were very well drafted.  Commissioner Lehrer asked staff if the Parks and Recreation Commission approved the findings.  Ms. Tanemori responded that the findings were drafted based on the Commission’s discussion during the September 10, 2007 meeting and feedback from staff representing the owner of the park.

 

Commissioner Genser commented that the suggested alternative language may have left out some important details such as information regarding the early history of the park.  Commissioner Bach responded that the language suggest the evolution of the park over time.

 

In regard to Finding 3, Commissioner Bach asked if the Commission should be strict about the use of the word “architects.”  Chair Pro Tempore Kaplan suggested that “architects” should be replaced with “architects and craftsmen.” 

 

Commissioner Bach made several minor corrections to Finding 6.

 

Commissioner Lehrer made a motion to approve the Landmark Designation application 06LM-009 for Palisades Park with the corrections made during the meeting.  Commissioner Bach seconded the motion.  The motion was approved by voice vote with Commissioner Berley abstaining.

 

5-B.     Certificate of Appropriateness Application 07CA-008, 415 Palisades Beach Road, approving lighting fixtures for the North House and Swimming Pool area of the previously-approved project for the rehabilitation and adaptive reuse of the former Marion Davies Estate as a public, beach-oriented recreation facility.

 

Ms. Tanemori made a correction to the vote on the Findings and Determination.

 

Chair Pro Tempore Kaplan made a motion to approve the Certificate of Appropriateness application 07CA-008 for 415 Palisades Beach Road with corrections.  Commissioner Lehrer seconded the motion.  The motion was approved by voice vote with Commissioner Berley abstaining.

 

6.                  PUBLIC INPUT: (On items not on agenda and within the jurisdiction of the Commission)

 

The following members of the public addressed the Commission, Jerry Rubin, Susan Hartley, and Scott Smith.  All of the members of the public spoke about the status of the lodged landmark application for the ficus trees located on the public parkway between Wilshire Boulevard and Colorado Avenue along the east and west sides of Second and Fourth Streets.

 

7.                  CONSENT CALENDAR:   None.

 

8.                  OLD BUSINESS:

 

8-A.     Landmark Designation Application, 07LM-004, 929 Lincoln Boulevard, to determine whether the multi-family residential property, in whole or in part, should be designated as a City Landmark. (Continued to the November 12, 2007 meeting)

 

9.                  NEW BUSINESS/PUBLIC HEARINGS:

 

9-A.     Review of Demolition Permits and Consideration Whether to File an Application for Designation of a Structure as a City Landmark or Structure of Merit.         

 

The Commission made ex parte communication disclosures.

 

Commissioner Berley made a motion to discuss 9-A.1, 9-A.2 and 9-A.3 as one item.  The motion was approved by voice vote.

 

1.         1550 Fifth Street (07PC1158)

C3-C – Downtown Overlay

Two-Story Commercial Building

Structure Identified in Historic Resources Inventory

(Continued from the September 10, 2007 meeting)

 

The following members of the public addressed the Commission: Derek Jones, Wende Goode, Bill Boehringer, Brad Goode and Teresa Grimes.  Mr. Jones, Ms. Goode and Ms. Grimes stated that the consultant’s report overstated Waterman Aviation’s connection to the site.  Mr. Boehringer stated that the structure was architecturally insignificant.  Mr. Goode asked the Commission to allow the redevelopment of the property.

 

Commissioner Genser asked Mr. Boehringer if he had knowledge that the properties were on the Historic Resources Inventory.  Mr. Boehringer responded in the affirmative.

 

Commissioner Genser noted that the buildings are contributors to a potential historic district.  Ms. Grimes noted that the preliminary report focused on Waldo Waterman, not on whether the structures were contributors to a potential historic district. 

 

Chair Pro Tempore Kaplan noted the site was significant because of its ties to early automobile culture in Santa Monica; additionally, the buildings have distinctive features of commercial architecture. 

 

A discussion was held regarding the historical significance of the site in connection to Mr. Waterman and the architectural integrity of the three buildings; the majority of the Commissioners did not support the nomination.  No action taken.

 

2.         1554-1558 Fifth Street (07PC1159)

C3-C – Downtown Overlay

One-Story Commercial Building

Structure Identified in Historic Resources Inventory

(Continued from the September 10, 2007 meeting)

 

Discussion held.  No action taken.

 

3.         417 Colorado Avenue (07PC1160)

C3-C – Downtown Overlay

One-Story Commercial Building

Structure Identified in Historic Resources Inventory

(Continued from the September 10, 2007 meeting)

 

Discussion held.  No action taken.

 

4.         829 Broadway (07PC1130)

BCD – Broadway Commercial

One-Story Commercial Building with Asphalt Paving

Structure Not Identified in Historic Resources Inventory

(Continued from the September 10, 2007 meeting)

 

Commissioner Bach stated that the Quonset hut as a property type appeared to have potential as a Landmark.  However, she also stated that the significance of the Quonset hut was not site specific.  She noted that the Quonset hut was once a part of Santa Monica’s wartime landscape.

 

Chair Fresco noted that the location of the Quonset hut may not be appropriate for the downtown area.

 

Commissioner Lehrer noted that the structure was a fairly intact example of a Quonset hut.  Additionally, she stated that the structure could be relocated to another location. 

 

Commissioner Shari noted that it would be better to revitalize the downtown commercial district with new projects rather than preserve the Quonset hut.

 

Commissioner Genser noted that the Quonset hut was a wonderful structure because the architecture of the hut could be seen as an early example of a Frank Gehry building type building.

 

Commissioner Bach noted the Quonset hut was a cultural artifact. 

 

Commissioner Lehrer stated that the Commission should consider a Structure of Merit designation as would be less onerous to the owner.  She stated that the consultant’s report did not address the context of the structure to similar structures in the City. 

 

Chair Fresco made a motion to nominate the structure on 829 Broadway as a City Landmark and to direct the consultants to address the issues discussed during this meeting.  Chair Pro Tempore Kaplan seconded the motion.

 

A roll call was held for the motion to designate the structure on 829 Broadway as a City Landmark and was approved by the following vote:

 

AYES: Bach, Fresco, Genser, Kaplan, Lehrer

NAYS: Berley, Shari

 

5.         626 Fourteenth Street (07PC1165)

R1 – Single Family Residential

Recreation Room & Carpet at Rear of Lot

Structure Not Identified in Historic Resources Inventory

 

No action taken.

 

            6.         2724 Sixth Street (07PC1191)

OP-2 – Ocean Park Low Multiple Residential

Single Family Residence, Garage, and Shack

Structure Not Identified in Historic Resources Inventory

 

No action taken.

 

7.         954 Fifth Street (07PC1236)

R-2 – Low Density Multiple Residential

Garage, Wood Shed and Detached Rear Unit

Structure Identified in Historic Resources Inventory

(Main residence was designated as a City Landmark on December 9, 2002. Structures located at rear of the parcel to be demolished are non-contributing structures.)  

 

No action taken.

 

8.         3030 Nebraska Avenue (07PC1239)

LMSD – Light Manufacturing and Studio

Two-Story Stucco Building and Parking Lot

Structure Not Identified in Historic Resources Inventory

 

Chair Pro Tempore Kaplan stated that 3030 Nebraska Avenue was the founding building of the Southern California Institute of Architecture (SCI-Arc).  Commissioner Berley asked staff to provide a preliminary report to determine which building housed SCI-Arc and to discuss its potential significance.

 

Chair Pro Tempore Kaplan noted that SCI-Arc was associated with significant architects such as Ray Kappe and Thom Mayne.

 

Commissioner Lehrer noted that she felt the building was on the cutting edge of modernism; therefore, further investigation was warranted.

 

Commissioner Berley made a motion to continue this item and for staff to provide additional information on this site.  Chair Pro Tempore Kaplan seconded the motion.  The motion was approved by voice vote.

 

9.         1815-1833 Stanford Street (07PC1240)

LMSD – Light Manufacturing and Studio

Two-Story Building and Parking Lot

Structure Not Identified in Historic Resources Inventory

 

Discussion held.  Commissioner Bach made a motion to continue this item and for staff to provide additional information on this site since it was not clear which building on the three parcels was associated with SCI-Arc.  Commissioner Lehrer seconded the motion.  The motion was approved by voice vote; Commissioner Genser did not vote in favor of the motion.

 

10.       3025 Olympic Boulevard (07PC1241)

LMSD – Light Manufacturing and Studio

One-Story Building and Parking Lot

Structure Not Identified in Historic Resources Inventory

 

Discussion held.  Commissioner Bach made a motion to continue this item and for staff to provide additional information on this site since it was not clear which building on the three parcels was associated with SCI-Arc.  Commissioner Lehrer seconded the motion.  The motion was approved by voice vote; Commissioner Genser did not vote in favor of the motion.

 

11.       1007 Sixth Street (07PC1281)

R-2 – Low Density Multiple Residential

Single Family Structure, 4-Unit Apartment and Garage

Structure Not Identified in Historic Resources Inventory

 

No action taken.

 

9-B.     Certificate of Appropriateness Application 07CA-010, 1685 Main Street, for approval of a new exterior elevator shaft, one-story electrical room, and other exterior modifications including addition of a new door and accessibility ramp at the courtyard and rear elevations of City Hall, a designated City Landmark.

 

The Commission made ex parte communication disclosures.

 

Ms. Tanemori presented the staff report.  Staff recommended that the Commission approve the Certificate of Appropriateness for 1685 Main Street.

 

Commissioner Lehrer asked staff how the exterior color will relate to the existing color of City Hall.  Ms. Tanemori responded that the color will match City Hall.  Commissioner Lehrer asked if the Office of Historic Preservation (OHP) made any comments about the window replacement.  Ms. Tanemori responded that the OHP made preliminary comments about the interior rehabilitation of the former jail cell wing; however, she had not yet reviewed the comments.  Ms. Tanemori added that staff reviewed the in-kind window replacements and determined that the approach was consistent with the Certificate of Appropriateness that was approved in 2002 for in-kind replacement windows on primary elevations of the building.

 

Commissioner Berley asked staff if the in-kind replacement windows would look the same as the ones that were already installed.  Ms. Tanemori responded that staff recommended that the windows be as close as possible to the existing windows.

 

The following members of the public addressed the Commission: Alex Parry, Civil Engineering Associate at EPWM Civil Engineering and Architecture. Mr. Parry gave a presentation regarding the proposed project. 

 

Chair Pro Tempore Kaplan asked Mr. Parry why Title 24 (related to energy efficiency standards) needs to be satisfied in this case since it’s an historic building. She also inquired about the replacement windows proposed for the project.  Mr. Parry responded the City would like to obtain a Leadership in Energy and Environmental Design (LEED) rating for City Hall; therefore, the performance of the building must be brought up to a certain standard. 

 

Commissioner Berley responded that the State Historic Preservation Office is interested in finding ways to bring historic resources as close as possible to compliance with energy efficiency standards without the loss of historic fabric.  If the windows were to be replaced, Commissioner Berley noted that the Commission would need to decide that request would significantly change the integrity of City Hall. 

 

Commissioner Bach asked Mr. Parry to describe the detail the connection point between the new stair tower and the existing building.  Mr. Parry responded that there are two places where the new elevator shaft would touch the existing building.  Commissioner Bach asked Mr. Parry to describe the finish of the proposed stucco and if any other exterior materials were considered.  Mr. Parry responded that the stucco will have a steel-trowelled finish; he stated that cast and place concrete, pre-cast concrete and metal panels were also considered. Commissioner Bach suggested that the metal reveal proposed as a separation between the new addition and the existing City Hall building should be used on the north and south sides of the stair tower.

 

Chair Pro Tempore Kaplan asked Mr. Parry how staff will ensure quality control with a design-built project.  Mr. Parry responded that the building will be design-bid-build and that the City has in-house architectural staff who will oversee the project.  Chair Pro Tempore Kaplan asked Mr. Parry to describe the historical oversight process during construction.  Mr. Parry stated that he had never worked with a historic oversight consultant and described the oversight process that will be used during the construction of the project.  Chair Pro Tempore Kaplan stated that someone whose main concern is oversight should be retained since the historic oversight consultant will be unwilling to make compromises because of cost.  Mr. Parry responded that if the retention of a historic oversight consultant is required to complete the project, one will be retained.

 

Commissioner Bach asked Mr. Parry to elaborate on the connection of the proposed temporary building and the elevator shaft.  Mr. Parry responded that the footprint of the new building is unknown at this point; however he described some of the schematic approaches that could be considered if the temporary building moves forward in the future.

 

Chair Pro Tempore Kaplan stated that the new temporary building should be separated from the existing building.  Mr. Parry responded if the new building was separate from the existing one, the programmatic needs of City Hall would not be met because the footprint of the temporary building would be too small.

 

Commissioner Berley asked Mr. Parry if every top-third glazed element would use spandrel glass.  Mr. Parry described the location of the kinds of glass that will be used for the project. 

 

Commissioner Berley stated that the color of the glass should be a grey or bronze tone; the spandrel condition should be reconsidered as well as it will affect the color of the glass.  He also stated that there should not be any differentiation between the hand rails on the ramps and the guard rails at the top of the deck.  In regard to the doors, Commissioner Berley stated that all of the doors should be painted white. Commissioner Berley also stated that the proposed horizontal banding should wrap around the corners of the electrical room and that the six-inch metal reveal that is on the north side of the building stair tower should be used on the south side of the building as well.

 

Commissioner Bach asked the Commission if the color of the project should be differentiated from City Hall.  Chair Pro Tempore Kaplan responded that the color should match.

 

Commissioner Lehrer stated that the windows which were installed in conjunction with the 2002 approval gave City Hall a different appearance and were not an in-kind replacement of the original windows. She also stated that the OHP supports retaining original windows if possible and that energy efficiency could be addressed in various ways other than replacing historic windows.  She stated that staff should address this issue by carefully selecting in-kind replacement windows or restoring the historic windows.

 

Chair Fresco stated that the railings on the deck should be similar to the ones that are currently used at the steps on City Hall.  She also stated that the scoring on the stucco surface should continue to be very simple.  Chair Fresco stated that the wall of glass would not relate to the building.  She noted that a row of windows would be lost during the construction of the project; she asked staff if the structure could be moved south to preserve the windows.  Mr. Parry responded that the structure would not comply with code if the structure is moved to the south.

 

Ms. Tanemori noted that the original windows have a wire netting on the glass since this was a former jail; the replacement would not have netting.  Ms. Tanemori asked the Commission if their discussion of “in-kind” replacement windows also included the installation of wire netting.  Commissioner Lehrer stated that in-kind replacement with the wire would protect the original character of the building. 

 

Since three historic windows will be lost, Commissioner Bach asked staff if these windows will be retained and saved.  Mr. Parry responded that the original windows are not currently installed in City Hall since they were replaced when the former Police Department building was demolished.

 

Commissioner Berley made a motion to approve the Certificate of Appropriateness based upon the design modifications as outlined during this meeting and that the in-kind window replacement come before the Commission as a separate Certificate of Appropriateness with a clear outline of the cost and benefits of restoring the original windows versus replacing them in-kind.  Commissioner Bach seconded the motion.

 

A roll call was held for the motion and was approved with the following vote:

 

AYES: Bach, Berley, Genser, Fresco, Kaplan, Lehrer, Shari

 

9-C.     Certificate of Appropriateness Application 07CA-009, 2642 2nd Street, for approval of demolition of a Non-Contributing structure, and construction of a new single-family residence on the property located within the Third Street Neighborhood Historic District.

 

Commissioner Genser recused himself as he owns property within 500 feet of 2642 Second Street.

 

The Commission made ex-parte communication disclosures.

 

Ms. Tanemori presented the staff report.  Staff recommended that the Commission approve the Certificate of Appropriateness

 

The following members of the public addressed the Commission: Mark Gorman (applicant), Linda Taalman (project architect), Karen Blechman, Maria Godfrey, Jim Bianco, Bea Nemlaha, Larry Graber, Tony Haig, and Howard Robinson.  Mr. Robinson (applicant representative) gave the rebuttal to public testimony; Ms. Taalman made a presentation to the Commission regarding the project; and Mr. Graber presented the report from the Citizen Participation Committee (CPC). 

 

Two members of the public supported the project; the remaining speakers opposed it. 

 

Commissioner Lehrer asked Ms. Taalman to discuss the suggestions made by the CPC.  Ms. Taalman described the changes that were made to the project after the first CPC meeting in July.

 

Chair Fresco noted that no one at the CPC expressed their approval or disapproval of the project.  Chair Fresco stated her own opinion of the structure: [1] there is too much flat glass; multi-pane windows would reflect the district better; [2] the south side of the structure does not have enough openings; [3] the skylight element is industrial -- a low-flat roof without the skylight element would be preferable; [4] the upper level should be secondary to the lower level; and [5] one type of wood should be used.

 

Commissioner Lehrer stated that the architecture was beautiful and would make a strong statement; however, the strong design would probably threaten the integrity of the district.  She stated that the Commission must consider how this project would fit into the Third Street Neighborhood Historic District and whether more contemporary manifestations of district character is an approach the Commission wants to endorse versus more traditional interpretations. 

 

Commissioner Berley stated that the Commission is evaluating how new buildings in a district can be a good ‘neighbor’.  He stated that the Commission should first consider whether good architecture has been presented.  He noted that the project has been designed sensitively, has a modesty that is encouraging, and expresses its time. Commissioner Berley recommended that the Commission move forward with this design.  The appropriate scale for a new building is always going to be examined carefully on a case by case basis. 

 

Commissioner Bach made a motion to continue past 11:00 pm.  Commissioner Lehrer seconded the motion which was approved by voice vote.

 

In regard to the size and height of the project, Chair Pro Tempore Kaplan stated that this project was better than structures which already exist on that particular block.  She also stated that the scale and design movements were extremely well executed and skillfully applied references to the district context have been incorporated in a modern vocabulary.  However, the height and the expression of the skylight might raise an issue of incompatibility with the district.  She noted that the architect should modify the saw-tooth skylight on the roof, which is a more industrial expression. She also suggested that the architects look more closely at the height of the stair tower.  She noted that this project would be acceptable in terms of its scale if a few modifications were made to the verticality emphasized on the rooftop.

 

Commissioner Bach stated she spent time in the district and recognized that there are ‘micro-climates’ in the district in terms of its character.  She stated that she lost track of the district character on 2nd Street though she experienced it strongly on 3rd, Beach and Hill Streets. Therefore, she evaluated the project in its context on 2nd Street.  Commissioner Bach stated that she could support this project; however, she explained that a few modifications should be made to the rooftop elements.  She stated that the applicant should reconsider the west facing skylight and the solar orientation and also reexamine the stair tower.

 

Chair Pro Tempore Kaplan reiterated that, in terms of evaluating appropriate scale for the neighborhood, she previously voted against the project next door because of the design’s oversized scale and massing. 

 

Commissioner Shari noted that new construction is a problem in a historic district; a 1,200 square foot structure is too small for a modern residence.  Therefore, she noted that the scale of new construction would not reflect the typical square footage found in the historic homes in the neighborhood.  She also noted that it would be unrealistic to expect a new craftsman bungalow, Spanish or American revival to be built in the district.  She stated that she supports the project; however a slightly modified design could improve it.  She also stated that the CPC should review the project again.

 

Chair Fresco stated that she could not support the project without changes to the design.

 

Commissioner Lehrer stated that the project does not meet the compatibility standards of the district even though the design is beautiful.  Commissioner Lehrer noted that there is an opportunity to do something in the current design that references the contributing buildings on Second Street.

 

Chair Fresco stated that a contemporary building which reflects the scale and does not try to mimic the style of authentic buildings in the district would enhance the look and feel of the district. 

 

Chair Pro Tempore Kaplan noted that the elements on the roof should be more modest. 

 

Commissioner Bach made a motion to reopen the public hearing to review with Ms. Taalman the changes that need to be made.  Commissioner Berley seconded the motion which was approved by voice vote.

 

Ms. Taalman asked the Commission to clarify the height restriction; she noted that part of the building is actually subterranean from the street level.  She noted that she might be able to modify the saw tooth; she stated that she may not be able to move the stair bulkhead of the building.

 

Commissioner Berley stated that the access to the roof could be modified.  Chair Pro Tempore Kaplan stated that there might be a way to split the roof deck.  Ms. Taalman stated that some of the ceiling heights are currently 7’-6” high; code requirements state that 7’-6” is the minimum interior ceiling height.

 

Commissioner Berley suggested that staff should work with applicant to discuss the changes recommended.  Ms. Tanemori stated that she has noted all of the comments made during this meeting.

 

Commissioner Bach made a motion to continue this item to the November 12, 2007 meeting.  Commissioner Shari seconded the motion which was approved by voice vote.

 

10.             DISCUSSION ITEMS:

 

10-B.   Discussion regarding timeframes, procedures, and outreach to residents concerning potential nomination of a Historic District in the South Beach Tract neighborhood (approximately bounded by Hollister Avenue, Ocean Park Boulevard, Barnard Way, and Neilson Way), including a report from the ad-hoc subcommittee of Commissioners formed to make recommendations on this matter.

 

Continued to November 12, 2007.

 

10-C.  Report from City Council Liaison to the Landmarks Commission on recent City Council actions related to appeals, development projects, planning policy studies and ordinances related to the City’s historic resources, and information concerning future City Council agendas.

 

City Council Liaison McKeown reported on the appeals that will come before the City Council.  He also reported that the City is working on a tree canopy preservation ordinance; the Landmark ordinance may not be the instrument in which to preserve trees.

 

City Council Liaison McKeown noted that the Social Services Commission received a report about the history of the Pico neighborhood; it addresses the economic, cultural and architectural history of the Pico neighborhood. 

 

10-D.  Report from Landmarks Commission Liaison to the Architectural Review Board (ARB) on recent ARB consideration and action taken on proposed projects involving additions to or modifications of potential historic resources.

 

Commissioner Berley reported that the ARB did not review any items that would concern the Landmarks Commission.

 

10-E.   Discussion and potential formulation of comments regarding the Draft Environmental Impact Report and its treatment of historic resources for the High Place Affordable Housing Development Project.

 

Chair Pro Tempore Kaplan recused herself because her employer was involved in reviewing the report.

 

Commissioner Bach noted that she did not visit the site but read the Environmental Impact Report (EIR).  She stated that there should be some archival effort to capture the evolution of neighborhood.

 

Chair Fresco asked Commissioner Bach if she would recommend that the EIR record the neighborhood photographically.  Commissioner Bach responded in the affirmative.

 

Commissioner Lehrer asked Commissioner Bach if she wanted more research regarding the history of the neighborhood or just architectural documentation.  Commissioner Bach responded that the EIR should have more information on the architectural, social, cultural and economic fabric of the community; part of the mitigation might include a contextual statement of the history of the neighborhood in relation to the evolution of the City.

 

Commissioner Bach made a motion to request a mitigation measure which would involve photographic documentation and a historical summary of the role and importance of the neighborhood in the history of Santa Monica.  Commissioner Lehrer seconded the motion which was approved by voice vote.

 

10-F.   Discussion and potential formulation of comments regarding the Draft Environmental Impact Report and its treatment of historic resources for the 1427 4th Street Mixed-Use Development Project.

 

Chair Fresco stated that the Environmental Impact Report (EIR) was incorrect; the EIR stated that there will be limited impact to historic resources if the project commences.  Chair Fresco noted that the EIR does not refer to the Lido Apartments and the Central Tower Building as part of the character of the block.  Commissioner Lehrer added that there are three historic buildings in a row next to 1427 Fourth Street.  Chair Fresco stated that the height of the new building must not overwhelm the Central Tower Building because the Central Tower Building should be the central tower on the block.

 

Commissioner Lehrer noted that there is a very strong historic context at the project site; the structure is a significant building because it is a period piece and was originally used for a market which was a prototype of the modern supermarket.  Commissioner Lehrer stated that this building played an important part of the social history of Santa Monica in regard to the economic development of the City.  Commissioner Lehrer also stated that the building is a Streamline Moderne building; however, she noted that there were some alterations.  If the downtown area became as historic district, she stated that the community would lose a contributor to the district.

 

Commissioner Bach suggested that a plaque acknowledging the history of the site could be included in the mitigation. 

 

Commissioner Bach made a motion to request mitigation for the loss of this resource by the erection of a plaque or some sort of acknowledgement to the history of the site.  Commissioner Lehrer seconded the motion which was approved by voice vote.

 

10-G.  Discussion and formulation of potential recommendations to the City Council regarding a proposed policy and possible strategies to conserve the City’s private tree canopy.

 

Continued to November 12, 2007.

 

10-H.   Discussion and potential recommendations from the landmarks Commission to City Staff or City Council regarding potential Municipal Code or City Charter revisions to allow condominium conversions of City Landmark designated multi-family rental units and/or designated commercial non-residential buildings and the potential for ownership of these rental properties.

 

Continued to November 12, 2007.

 

10-I.     Discussion and potential formulation of recommendations to City staff to forward to the City Council regarding annual Landmark Designation Application fee increases.

 

Continued to November 12, 2007.

 

10-J.   Discussion regarding a resident’s request for the City to install a plaque to commemorate the Third Street Neighborhood Historic District.

 

Continued to November 12, 2007.

 

10-K.   Planning Commission Case List (Information Only).

 

11.             WRITTEN COMMUNICATIONS: None.

 

12.             FUTURE AGENDA ITEMS:  (Requests from Commissioners to add items to upcoming agendas)

 

Chair Fresco noted that the future agenda items should include items continued from this evening’s meeting.

 

Commissioner Bach asked to agendize the approach to use to erect plaques on historic structures.

 

Commissioner Lehrer asked to agendize a discussion of downtown buildings with a high level of significance such as the Keller Block.  Ms. Tanemori reported that the following landmark applications are pending: 312 Wilshire Boulevard, the Paul Williams building, the Banana Republic building, and the Keller Block building.

 

Chair Fresco suggested that the Landmarks Commission hold a special meeting to catch up on pending items.

 

13.             NEXT MEETING DATE AND COMMISSION AGENDA: Regular Meeting: 7:00 PM Monday, November 12, 2007; City Council Chambers, Room 213, City Hall.

 

14.             ADJOURNMENT:  Commissioner Genser made a motion to adjourn the meeting at 11:49 pm.  Commissioner Shari seconded the motion which was approved by voice vote.

 


ATTACHMENT D

 

Landmarks Commission Staff Reports and Hearing Submittals,

October 8, 2007 and December 10, 2007


M E M O R A N D U M

 

CITY PLANNING DIVISION

 

PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT

CITY OF SANTA MONICA

 

 

DATE:                  October 8, 2007

 

TO:                  The Honorable Landmarks Commission

 

FROM:           Planning Staff

 

SUBJECT:       Certificate of Appropriateness Application 07CA-009

                                   

Certificate of Appropriateness Application requesting approval of demolition of a Non-Contributing Structure on the property at 2642 Second Street and proposed construction of a new single-family residence on the parcel located within the Third Street Neighborhood Historic District.

 

APPLICANT: Mark Gorman and Beth Burns 

PROPERTY OWNER: Mark Gorman and Beth Burns

 

 

INTRODUCTION AND BACKGROUND

 

The subject Certificate of Appropriateness application requests approval to demolish the existing Non-Contributing structure on the site and construct a new 2,600 square foot single-family residence and detached garage at 2642 Second Street, a property located within the boundaries of the formally adopted Third Street Neighborhood Historic District. 

 

The subject property is an approximately 50’ x 100’ and is located on the west side of Second Street between Beach Street and Hill Street.  The existing one-story duplex and garage was constructed in 1953 and was determined to be a Non-Contributing structure when the Third Street Neighborhood Historic District was established in July 1990.  The property to the south is currently vacant, however an approval was recently granted for the construction of a new, two-story plus mezzanine single-family residence. The property to the north consists of a parking lot and one-story structure.  

 

Within the Second Street block between Beach and Hill Streets are a total of three Contributing structures: a single-story residence two parcels to the south of the subject property, and a residence and church on the east side of Second Street also to the south.  The remaining structures in the neighborhood are comprised of Non-Contributing one- and two-story single-family residences and multi-story post World War II apartment buildings. 

 

 

NOTICE

 

Notice of this hearing was provided as required by Section 9.40.040(b) as follows: posting of the site; notice sent to all owners and occupants within a 300-foot radius of the subject property and to all owners and occupants of properties within the adopted Third Street Neighborhood District boundaries; and a newspaper notice published in the Santa Monica Daily Press at least 10 days prior to the hearing date.

 

The application and project plans were distributed to the Third Street Neighborhood Historic District Citizen Participation Committee (CPC) and the applicant met with the CPC to present and discuss the project on two occasions: July 16, 2007 and August 20, 2007.

 

CEQA STATUS

 

The project is categorically exempt from the provisions of California Environmental Quality Act (CEQA) pursuant to Section 15303, Class 3 and Section 15331, Class 31 of the State Implementation Guidelines in that the project consists of modifications to a single family residence that has been designed in a manner consistent with the Secretary of the Interior’s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995), Weeks and Grimmer. 

 

PROJECT DESCRIPTION

 

The applicant proposes to demolish the existing structures on site and construct a 2,600 square foot, two-story residence with a roof deck. A detached two-car garage is proposed at the rear of the parcel at the northwest corner.  All setbacks incorporated into the project design meet zoning ordinance requirements for the OP-2 Zoning District.  The height of the proposed residence is 23’-0” to the top of the flat roof in accordance with zoning district standards. The saw-tooth skylight and the stair enclosure are permitted projections above the 23’-0” building height for structures with flat roofs.  However, both elements are less than 30’-0” above theoretical grade, the maximum height permitted for a pitched roof in the zoning district. 

 

The proposed residence is designed to reflect elements of the International style in accordance with the adopted Ocean Park Neighborhood Development Guide which specifies that new construction in the OP Zoning Districts must be designed in the following historical styles: International style/modern, Craftsman bungalow, or Spanish Colonial Revival/Mediterranean style. 

 

The proposed two-story residence is composed of two rectangular volumes clad in sand finish stucco and wood. The proposed saw-tooth skylight element over the south volume incorporates a standing seam metal roof sloped toward the street and skylights oriented to the west that will not be visible from the public right-of-way.  The stair enclosure also features a sloped, standing seam metal roof and provides access to a deck located on the south side of the roof.  

 

The primary elevation features doors and windows framed in teak wood, a centrally-located second floor balcony and ground floor recessed primary entry, and a wrap-around second floor window accented by a reclaimed ponderosa pine eyebrow on the south volume. The north volume features reclaimed ponderosa pine vertical siding and an overlay of wood boards turned to a 90-degree angle forming a ‘bris-soleil’ type trellis for plantings. This wood cladding wraps around from the primary, east-facing elevation to the north elevation adjacent to the proposed driveway leading to the garage sited at the rear of the parcel.  The south elevation features sand finish stucco, aluminum framed fenestration and a horizontal ponderosa pine eyebrow extending the above the second floor windows to the rear of the building.

 

A grass-crete driveway is proposed on the north side of the parcel that would lead to a two-car garage at the rear of the property.  This one-story structure is also proposed with a ponderosa pine trellis element with plantings and a wood garage door.

 

 

ANALYSIS

 

Project Design Compatibility

 

As with all requests for new construction within the Third Street Neighborhood Historic District, proposed work must be undertaken in a manner consistent with the character of the District and with the Secretary of the Interior’s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Properties.

 

The way in which the new building visually relates to adjacent properties is an important aspect of staff review of new construction in the Third Street Neighborhood Historic District. A new building constructed in a historic district should respect and not detrimentally impact the character of the District. Compatibility is achieved by identifying and incorporating elements found in the historic district into the design of the new structure.  The goal is not to imitate or duplicate a historic building, thereby creating a false sense of history, but to construct a new building that is compatible with its surroundings.  Key factors to evaluate include site planning; building size, scale, and massing; and the choice of roof form, doors and windows, and materials.

 

In terms of the Secretary of the Interior’s Standards, the proposed scope of work includes rehabilitation as the primary treatment for the project site. The Secretary of the Interior’s Standards define rehabilitation as, “The act or process of making possible a compatible use for a property through repair, alterations, and additions while preserving those portions or features which convey its historical, cultural, or architectural values”.

 

According to the Standards, related new construction is permissible in a historic district when its effect on the contributing properties “does not destroy historic materials, features, and spatial relationships that characterize the property,” and if the new work is “differentiated from the old and will be compatible with the historic materials, features, size, scale and proportion, and massing to protect the integrity of the property and its environment.”

 

The proposed project is also subject to the Third Street Neighborhood Historic District Design Guidelines.  The Guidelines, which were approved in 1992, provide suggested direction for a project applicant in approaching the design of a new structure in the District.

 

The Guidelines do not specifically prescribe the selection of architectural styles. However, new construction should, regardless of style, express a consistent and compatible architectural language and should respect and not detrimentally impact or overwhelm the character of the District.  For new construction, the Guidelines suggest the following:

 

“New buildings should be carefully designed to complement and not overwhelm the surrounding historic buildings.

 

·        Use exterior materials traditionally found in the Third Street neighborhood, such as wood and stucco.

·        Maintain setbacks, heights, and overall building shapes that are similar to surrounding contributing buildings in the historic district.

·        Use windows and architectural details at the street level to create a pedestrian scale and a “neighbor-friendly” character.

·        Include a clearly defined main entrance that is oriented toward the street. Parking should be at the rear of the property.”

 

With respect to the Secretary of the Interior’s Standards, staff reviewed the proposed residence in the context of its impact on the general character and scale of the District.  Staff also reviewed the proposal for compliance with the District Design Guidelines for new construction outlined above. 

 

The project demonstrates compatibility with the District character in several key ways.  The planning of the site and the study of the site responds to its surrounding environment.  The tallest elements of the building are located on the south volume which will be adjacent to the recently approved residence that rises to 30’-0” in height (see north elevation) and the north volume remains at 23’-0” in height in order to better respond to the scale of the surface parking lot and one-story structures to the north of the site. 

 

The two distinct volumes (north and south) have been purposefully differentiated by a change in material in order to break up the perceived massing of the structure.  The simple building forms create an understated backdrop for the historic architecture in the District while still incorporating carefully selected architectural elements and materials to complement and reflect the District’s character.  Examples of such features include the sloped saw-tooth roof and stair enclosure provides a reflection on the pitched roofs exhibited Contributing Structure across the street. The building’s flat roof and simple rectangular volumes are also found in the architecture of other Contributing Structures in the Historic District. 

 

In accordance with the District Design Guidelines, the proposed project incorporates sand finish stucco and extensive amounts of ponderosa wood cladding and teak wood framed fenestration.  These materials not only reinforce the project’s design concept but also compatible with the materials historically found in the District. 

 

The City’s historic preservation consultant reviewed the proposed plans and prepared a plan review memorandum (Attachment B). The consultant’s analysis supports the project as a whole and also suggests several refinements to the design would make it more pedestrian friendly at the street level.  Staff has reviewed the consultant’s suggestions and agrees that the project merits support, however, staff finds that the primary elevation is appropriately scaled and does incorporate a clearly defined entry that does not require further articulation. 

 

Staff also finds that the north elevation is sufficiently articulated by the vertical wood siding and trellis with plantings that adds texture and warmth to the elevation. Furthermore, the primary elevation incorporates a significant amount of glazing to serve as a pedestrian-friendly element.  In this case, additional glazing on the north elevation does not appear to be necessary on the north elevation since it is adjacent to a surface parking lot.  Finally, staff believes that the saw-tooth skylights and stair tower are unique design elements that complement the overall design concept and also reflects, in a contemporary interpretation, aspects of the historic architecture in the District.

 

Third Street Neighborhood Citizen Participation Committee

 

The Third Street Neighborhood Citizen’s Participation Committee (CPC) was notified of the application within five days of the applicant’s filing in September 2007.  The applicant met with the CPC on two occasions over the summer (July 16, 2007 and August 20, 2007).  According to the applicant, the current submittal reflects changes made in response to comments received during the first neighborhood meeting.  The applicant brought back the revised plans at the second meeting for further discussion. 

 

Staff has not received any comments from the CPC or individual members of the community regarding the proposed project.  However, the applicant’s submittal contains a description of what comments they heard at the meeting and how they feel the project design has been revised to address those concerns. 

 

CONCLUSION AND RECOMMENDATION

 

Based on the foregoing, staff recommends approval of Certificate of Appropriateness 07CA-009 for modifications to the property as enumerated, and per the findings below as required in SMMC 9.40.030.

 

CERTIFICATE OF APPROPRIATENESS FINDINGS (SMMC 9.40.030)

 

3.                  The proposed project is included within the list of work enumerated in SMMC Section 9.40.020 (d) (4).

 

The exterior features of the proposed new improvement on a parcel located within the Third Street Neighborhood Historic District boundaries and its placement on the property would not adversely affect and would not be disharmonious with the District character as set forth in Section 9.36.290, and with the scale, materials and massing of the contributing structures within the District in that the scale, massing, volume and materials proposed in the two-story single-family residence are consistent with the District’s intention that new structures should respect the neighborhood’s historic scale and character. The proposed demolition of the Non-Contributing structures on the parcel would also not adversely affect the character of the District since the existing structures were constructed in 1953 and do not contribute the District’s period of significance. The proposed new construction relates harmoniously to its placement within a historic district as called for in the District’s Design Guidelines, which advise that infill buildings should “maintain setbacks, heights, and overall building shapes that are similar to surrounding contributing buildings in the Historic District.” The adjacent parcel to the south is currently vacant but has been approved for a new 30’-0” tall two-story residence; the tallest portions of the proposed project are sited adjacent to the this parcel.  The parcels to the north consist of a surface parking lot and two one-story structures.  Accordingly, the north volume of the subject residence would remain at 23’-0” in height.  Furthermore, many contributing District structures are two-story homes, and it is appropriate to allow two stories on this property, provided that the design of the proposed structure does not overwhelm nearby contributing properties.  The simple building forms create an understated backdrop for the historic architecture in the District while still incorporating carefully selected architectural elements and materials to complement and reflect the District’s character.  Examples of such features include the sloped saw-tooth roof and stair enclosure provides a reflection on the pitched roofs exhibited Contributing Structure across the street. The building’s flat roof and simple rectangular volumes are also found in the architecture of other Contributing Structures in the Historic District.  Finally, in accordance with the District Design Guidelines, the proposed project incorporates sand finish stucco and extensive amounts of wood cladding and teakwood framed fenestration.  These materials not only reinforce the project’s design concept but also compatible with the materials historically found in the District.  Based on the foregoing, the proposed project is consistent with the Secretary of the Interior’s Standards for the Treatment of Historic Properties, and with the guidelines set forth in the design guidelines for the Third Street Neighborhood Historic District.

           

CONDITIONS 

 

6.                  This approval is for the plans submitted on September 28, 2007 which are on file in the City Planning Division.

 

7.                  This Certificate of Appropriateness shall be in full force and effect from and after the date of the rendering of the decision by the Commission.  Pursuant to Landmarks Ordinance Section 9.36.170(h), this approval shall expire within 180 days if the authorized work is not commenced.  Should the applicant be unable to comply with this restriction, an extension may be granted pursuant to Landmarks Ordinance Section 9.36.250.  After that time, the applicant will be required to return to the Commission for approval.  In addition, this Certificate of Appropriateness shall expire if the authorized work is suspended for a 180-day period after being commenced.    This decision may be appealed by properly filing with the Director of Planning a Notice of Appeal on a form furnished by the Planning Department.  Such notice shall be filed within a ten (10) day time period commencing from the date of the determination.

 

8.                  All required Planning and Building Permit approvals shall be obtained.

 

Attachments:   

      

A.     Public Notice

B.    PCR Services Memorandum

C.    Project Plans

 

 


 

M E M O R A N D U M

 

CITY PLANNING DIVISION

 

PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT

CITY OF SANTA MONICA

 

 

DATE:               December 10, 2007

 

TO:                  The Honorable Landmarks Commission

 

FROM:           Planning Staff

 

SUBJECT:       Item 8-C. Certificate of Appropriateness Application 07CA-009

                                   

Certificate of Appropriateness Application requesting approval of demolition of a Non-Contributing Structure on the property at 2642 Second Street and proposed construction of a new single-family residence on the parcel located within the Third Street Neighborhood Historic District.

 

APPLICANT: Mark Gorman and Beth Burns 

PROPERTY OWNER: Mark Gorman and Beth Burns

 

 

INTRODUCTION AND BACKGROUND

 

The subject Certificate of Appropriateness application requests approval to demolish the existing Non-Contributing structure on the site and construct a new 2,365 square foot[1] single-family residence and detached garage at 2642 Second Street, a property located within the boundaries of the formally adopted Third Street Neighborhood Historic District. 

 

The subject property is an approximately 50’ x 100’ and is located on the west side of Second Street between Beach Street and Hill Street.  The existing one-story duplex and garage was constructed in 1953 and was determined to be a Non-Contributing structure when the Third Street Neighborhood Historic District was established in July 1990.  The property to the south is currently vacant, however an approval was recently granted for the construction of a new, two-story plus mezzanine single-family residence. The property to the north consists of a parking lot and one-story structure.  

 

The Landmarks Commission opened the public hearing for the application on October 8, 2007 and, after an extensive discussion regarding the proposal, the hearing was continued to allow the applicant to revise the project based on specific direction provided by the Commission during the course of the discussion. 

 

Staff has analyzed the project revisions in light of the Commission’s direction to the applicant and has also revised the recommended draft findings as necessary to reflect the current proposal.

 

NOTICE

 

Notice of this hearing was provided as required by Section 9.40.040(b) as follows: posting of the site; notice sent to all owners and occupants within a 300-foot radius of the subject property and to all owners and occupants of properties within the adopted Third Street Neighborhood District boundaries; and a newspaper notice published in the Santa Monica Daily Press at least 10 days prior to the hearing date.

 

The application and project plans were distributed to the Third Street Neighborhood Historic District Citizen Participation Committee (CPC) and the applicant met with the CPC to present and discuss the project on two occasions: July 16, 2007 and August 20, 2007. The CPC also held a meeting to discuss the project the week of November 5, 2007. 

 

CEQA STATUS

 

The project is categorically exempt from the provisions of California Environmental Quality Act (CEQA) pursuant to Section 15303, Class 3 and Section 15331, Class 31 of the State Implementation Guidelines in that the project consists of modifications to a single family residence that has been designed in a manner consistent with the Secretary of the Interior’s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995), Weeks and Grimmer. 

 

PROJECT DESCRIPTION & ANALYSIS

 

Analysis of Project Revisions

 

At the October 8, 2007 hearing, the Landmarks Commission listened to public testimony both in opposition and in support of the proposal, discussed the proposed Certificate of Appropriateness application, and also discussed the issue of how best to approach infill in the Third Street Neighborhood Historic District. While the project’s overall design concept was not unanimously supported, a majority of Landmarks Commissioners expressed satisfaction with the overall design concept for the project and indicated that the proposal was appropriately responsive to the character of the District and its context on Second Street.

 

Individual Commissioners did, however, provide specific comments regarding project refinements that would help to address concerns expressed about compatibility with the District’s character. As a result of this discussion, there appeared to be consensus regarding several recommended project refinements and the applicant was, therefore, directed to revise plans with consideration to the following in order to better respond to the context of the District:

 

·        Re-evaluate the verticality-emphasized elements on the rooftop including the industrial saw-tooth skylight and projecting stair tower; and

 

·        Incorporate fine-grain details that reflect the texture and character of the District in order to better articulate and break up some of the flat areas of the building façades.

 

The following discussion contains a summary of key revisions reflected in the modified project design contained in Attachment C. This analysis should be considered in conjunction with all previously-distributed materials regarding the subject application including correspondence attached hereto; the October 8, 2007 staff report and attachments; and with all public testimony and correspondence provided at the October 8, 2007 public hearing and forthcoming December 10, 2007 hearing.

 

The applicant has made a series of revisions to the project design based on the Commission’s direction.  In order to better reinforce the horizontality of the building design, reduce the mass of the building at the roofline, better articulate the building elevations, and enhance compatibility with the character of the District, the revised project design incorporates refinements to all four building elevations, significant changes to roof including the removal of the projecting stair tower and saw-tooth skylight, as well as a reduction in proposed floor area. 

 

  • In order to entirely remove the stair tower/bulkhead, the applicants propose an exterior stair on the inside, northwest corner of the house. This stair has been set back as far from the street as possible and has been further refined in order to lower the stair guard rail below the roofline to entirely eliminate its visibility from the street and to create a more streamlined building roofline. This modification serves to reduce the maximum height of rooftop elements by approximately 3 ½ feet. 

 

  • The creation of the exterior stairwell resulted in necessary modifications to the interior floor plan of the second floor, including a 235 square foot reduction in floor area through the elimination of a previously-proposed guest bedroom.

 

  • The proposed wood trellis on the north elevation has been extended to screen the new exterior stairwell and the kitchen window below, and to also further break up and articulate the west end of the north elevation. 

 

  • The previously-proposed saw-tooth skylight has been removed and replaced with a clerestory skylight that is further stepped back from primary elevation, thus reducing its visibility from the street.

 

  • On the primary, street-facing east elevation a section of the taller, south volume has been reduced in its horizontal dimensions thus resulting in a more narrow presence and reduced mass facing the street.

 

  • A ponderosa pine screen has been incorporated on the primary, street facing elevation adjacent to the main entry in order to add texture and finer-grain detail to the sections of smooth stucco on this elevation. This ponderosa screen also serves divide the expanse of glass on the ground floor of the street-facing elevation.

 

  • In order to better reflect the character of the District, fenestration on the street-facing elevation has been refined to include additional openings to the wrap-around windows on the second-story, and to divide the existing windows on the ground-floor into multiple panes a maximum of 2’-0” wide.

 

  • Fenestration on the south elevation has been modified in response to programmatic changes resulting from the creation of the exterior stairwell and loss of floor area.  In addition, windows on the south elevation have been further divided to add more articulation to this elevation.

 

Since the November 12, 2007 hearing, staff has received additional comments from members of the community both in opposition and in support of the proposed project.  This correspondence is contained in Attachment B. 

 

CONCLUSION AND RECOMMENDATION

 

In reviewing the revised plans, staff finds that the applicant has made appropriate revisions that have resulted in a project that better demonstrates compliance with the District Design Guidelines and addresses the Commission’s specific direction provided at the October 8, 2007 hearing.  Based on the entirety of the record, it is recommended that the Landmarks Commission approve Certificate of Appropriateness 07CA-009 per the following draft findings and conditions:

 

CERTIFICATE OF APPROPRIATENESS FINDINGS (SMMC 9.40.030)

 

4.                  The proposed project is included within the list of work enumerated in SMMC Section 9.40.020 (d) (4).

 

2.         The exterior features of the proposed new improvement on a parcel located within the Third Street Neighborhood Historic District boundaries and its placement on the property would not adversely affect and would not be disharmonious with the District character as set forth in Section 9.36.290, and with the scale, materials and massing of the contributing structures within the District in that the scale, massing, volume and materials proposed in the two-story single-family residence are consistent with the District’s intention that new structures should respect the neighborhood’s historic scale and character. The proposed demolition of the Non-Contributing structures on the parcel would also not adversely affect the character of the District since the existing structures were constructed in 1953 and do not contribute the District’s period of significance. The proposed new construction relates harmoniously to its placement within a historic district as called for in the Third Street Neighborhood Historic District Design Guidelines and Landscape Survey which advises that infill buildings should “maintain setbacks, heights, and overall building shapes that are similar to surrounding contributing buildings in the Historic District.” The adjacent parcel to the south is currently vacant but has been approved for a new 30’-0” tall two-story residence; the tallest portions of the proposed project are sited adjacent to the this parcel.  The parcels to the north consist of a surface parking lot and two one-story structures.  Accordingly, the north volume of the subject residence would remain at 23’-0” in height.  Furthermore, many contributing District structures are two-story homes, and it is appropriate to allow two stories on this property, provided that the design of the proposed structure does not overwhelm nearby contributing properties.  The simple building forms create an understated backdrop for the historic architecture in the District while still incorporating carefully selected architectural elements and materials to complement and reflect the District’s character.  Examples of such features include its low overall building height and articulated building volumes, wood architectural details that reflect in a contemporary manner the wood siding incorporated in historic bungalow architecture and its multi-pane fenestration that also echoes the proportions and of details found in the District.  The building’s flat roof and simple rectangular volumes are also found in the architecture of other Contributing Structures in the Historic District.  Finally, in accordance with the District Design Guidelines, the proposed project incorporates sand finish stucco and extensive amounts of wood cladding, screens, and teakwood framed fenestration.  These materials not only reinforce the project’s design concept but are also compatible with the materials historically found in the District.  Based on the foregoing, the proposed project is consistent with the Secretary of the Interior’s Standards for the Treatment of Historic Properties, and with the guidelines set forth in the Design guidelines for the Third Street Neighborhood Historic District.

 

CONDITIONS 

 

9.                  This approval is for the plans dated November 1, 2007 and December 1, 2007 (north elevation only) which are on file in the City Planning Division.

 

10.             This Certificate of Appropriateness shall be in full force and effect from and after the date of the rendering of the decision by the Commission.  Pursuant to Landmarks Ordinance Section 9.36.170(h), this approval shall expire within one year if the authorized work is not commenced.  Should the applicant be unable to comply with this restriction, an extension may be granted pursuant to Section 9.36.250 for an additional 180 days maximum.  The applicant must request such an extension prior to expiration of this permit.  After that time, the applicant will be required to return to the Commission for approval.  In addition, this Certificate of Appropriateness shall expire if the authorized work is suspended for a 180-day period after being commenced.   

 

 

11.             All required Planning and Building Permit approvals shall be obtained.

 

12.             This decision may be appealed by properly filing with the Director of Planning a Notice of Appeal on a form furnished by the Planning Department.  Such notice shall be filed within a ten (10) day time period commencing from the date of the determination.

 

 

Attachments:

      

D.    Public Notice

E.     Additional Correspondence Received Regarding the Subject Application

F.     Project Plans

 

 

 

 

 

 


ATTACHMENT E

 

Property Owners’ Statement Regarding the Appeal and Project Plans and Renderings

Electronic version of attachment is not available for review.  Document is available for review at the City clerk’s Office and the Libraries.



1. The original proposal reviewed by the Landmarks Commission on October 8, 2007 consisted of a 2,600 square foot residence. The revised proposal presented for the December 10, 2007 meeting represents a 235 square foot reduction in floor area.