City of Santa Monica - Click here to go home
City of Santa Monica - Click here to go home Click here to skip the main navigation
Click here to skip the main navigation  
   Home / City Hall  / Departments / Planning / Building & Safety / Important Dates
clear image for spacing
 

Important Dates      

Geotechnical

Report

Requirements


Geotechnical Report Submittal Requirements

Effective July 1, 2008

Guidelines for Geotechnical Reports (click here)

Signature Page for Geotechnical Report Submittal (click here)

 

2.5 Submittal Requirements for Geotechnical Reports and Plans

 
   

2.5.1 Initial Submittal Requirements

 
   

A complete submittal shall contain the following:

 
   

 

 

Geotechnical reports, maps, and related documents submitted to the City are required to be in electronic format (pdf). The CD shall be clearly labeled with the following information: (1) project address and Assessor's Parcel Number, (2) name and address of consulting firm preparing the geotechnical report, and (3) space to add the Plan-Check Number (e.g. Plan-Check 08PC0000). Also, a signature page form, which is available at the City Hall public counter, shall be submitted with the CD.

   

A set of plans including: site, drainage, grading, and foundation plans for all proposed structures.  Plans must show the name, address, phone number, and license number of the Project Consultant in charge.

     

 


 

This page was last modified on 04/23/2009

clear image for spacing
City of Santa Monica · 1685 Main St., Santa Monica, CA 90401 · (310) 458-8411 · TTY (310) 917-6626
Copyright © 2008 City of Santa Monica. All Rights Reserved. Privacy Policy | Accessibility Policy | Contact Us