NOTICE OF
COMPLETION & PUBLIC NOTICE OF AVAILABILITY OF A DRAFT ENVIRONMENTAL
IMPACT REPORT (DEIR), ENVIRONMENTAL ASSESSMENT (EA) AND SECTION 4(f)
EVALUATION ON THE |
OFFICIAL NOTICE is hereby given on the completion and availability of a Draft Environmental Impact Report (DEIR), Environmental Assessment (EA) and Section 4(f) Evaluation on the following project:
PROJECT LOCATION:
DESCRIPTION OF PROJECT: The Draft EIR /EA analyzes five (5) different alternatives
and a No Project alternative for improving both pedestrian and vehicle access
to the Santa Monica Pier. Each alternative includes seismic strengthening of
the Pier.
The alternatives are as
follows:
1.
Locally Preferred Project: Parallel
Vehicular Ramp with
2.
Parallel Vehicular Ramp and
3.
Ramp Through
the Pier Deck: This alternative would construct a
vehicle access ramp through the Pier Deck to a bay underneath the Pier that
feeds into the parking lot at 1550 PCH. The
4.
5.
Pedestrian-Only Bridge with Service/Emergency
Vehicle Access Only and Replacement Parking: This alternative
would reinforce and convert the bridge to primarily a pedestrian-only bridge
that would allow service and emergency vehicles only. This would result in the
loss of 283 parking spaces located on the Pier. This document analyzes the
construction of replacement parking nearby. The
The Draft Environmental
Impact Report /Environmental Assessment and Section 4(f) Evaluation on this
project is available for your review and comment. This document examines impacts of the
proposed project on the City's environment including the historic Pier Sign.
Environmental effects of one
or more of these options may include:
Aesthetics, Biological Resources,
Historic Resources, Noise (during construction), and Vehicle Circulation.
Impact areas analyzed in the Environmental Impact Report are:
Aesthetics, Air Quality, Archaeological
Resources, Biological Resources, Hazardous Materials, Historic Resources,
Noise, Access, Pedestrian Circulation and Parking, Land Use.
HOW TO
City
Planning Counter, Room 111 City
Clerk, Room 102
If
you have comments about the DEIR, you should forward them to Sarah Lejeune,
AICP, Senior Planner, so that they can be considered.
(5:00
p.m.)
WHERE TO SEND COMMENTS: City Planning Division
Attention: Sarah
Lejeune, AICP, Senior Planner
Telephone: (310)
458-8341
e-mail: sarah.lejeune@SMGOV.net
PUBLIC
MEETINGS TO DISCUSS:
During
the time that the EIR is circulating for review, there will be two public
meetings at which the public may comment.
Monday , August 21, 2006
1527
Monday,
September 11, 2006 -7:00PM
Landmarks
Commission Meeting
City Council
Chambers, Room 213
MORE INFORMATION: Following
the completion of the Final EIR, additional notice will be given upon
scheduling a Public Hearing before the City Council to certify the EIR, review
the project options and select an option for final design and construction.